For Robert
The pages Robert reads, and the rows that wait on him. He reviews the decision log, not the queue; the lead decides and records, and a row marked “for Robert” is one he can overturn.
Read first
- state-of-the-project — the whole picture, rewritten at every pause
- roadmap — the “Where we are” table, the authority on order
- decision-log — every decision with who, status, and what first tests it; rows tagged
semanticare the ones that touch failure, authority, equality, persistence, deadlines, or scheduling - HANDOFF is at the repo root: the state, the queue, and what a fresh session must know
Rows waiting on him, as of 17 Sep 2026, newest first
- The bricks page (17 Sep, afternoon): the shelf boundary and program 7’s two bricks; the five audit items, the caps, and the cost (bricks-and-the-cost-of-zero-dependencies)
- How the audit runs, in one page: the-audit-workflow (17 Sep, evening); the day’s raw evidence for an audit session is under
audit/evidence/2026-09-17/ - The auditor role taken up (17 Sep, afternoon): M-3 accepted, the bricks page before program 7, and three disagreements with the ratified rules: program 7’s shape against the capabilities rule, the R-A trigger at zero catches, the runtime rule’s open clauses read in advance (decision-log)
- Research PR 2 read and merged; chapter 10’s restart-budget attribution corrected (hermes-daily-2026-09-16, hermes-daily-2026-09-17)
- Generation five’s reading: the first Mo-only defect, the laws still silent (erosion-round)
- The change 4 Mo queue nine times slower on the lease path; speed recorded per generation (erosion-round, interpreter-step-34)
- Generation four; generation three, the BEAM’s row answered (erosion-round)
- Chapter 10 §2’s budget as a value (10-language-after-the-rounds)
- P6 on Mo’s change 2 (erosion-round)
- Round 9’s Haiku row and its reading (control-run-9)
- Generation two (erosion-round)
- Chapter 10 §1 as built, the deferred reply, and chapter 10 itself (10-language-after-the-rounds, interpreter-step-31)
- P6 on Elixir and the BEAM row after round 10 (control-run-10)
- Measurement 1’s completeness row (bodies-as-cache)
- The outage of round 8, probed and read (control-run-8)
- The 16 lint issues from his history bundle
His locked calls, where they are recorded
The thesis restated (14 Sep), the measure from round 7 on, the counted laws as settings, the Elixir round, the small-model round with open-weights models, the Mac scaling run, the standing rule that the lead decides and never waits: all rows in decision-log, most quoted in 01-premise and 08-milestone under their session headings.
What he asked for and why
- d01-agents-write-the-code, d02-spec-altitude, d28-nothing-final-until-measured — the premises he set
- d41-small-model-round, d42-elixir-round, d43-five-measurements — the experiments he asked for or agreed to
- idea-backlog — ideas parked, not lost